
This is facing North with the North and West exterior walls up.

This shot from ground level shows that the upper level East and South walls are just about done. They still need to cut the windows out on the South wall. Also, the large opening on the Southeast wall will be framed in for a couple windows. I think they are leaving it open for now, so they can pump in the concrete for the floor when we get to that stage. We will have radiant heat throughout the house. You can also see some of the roof trusses in the foreground.

This is looking toward what will eventually be the office, the second bedroom and the spare bathroom. It is difficult to really see it because the studs are more skeletal than defining.

This is about the same view as the previous pic. Notice that they have started installing roof trusses. The plan for this week is to measure the kitchen and bathrooms for cabinets since they will require 8 weeks to delivery. The great thing is that it is finally starting to look like something.



