


Two closer views of the bump out.

And a shot from the kitchen looking into the breakfast room.

This is our builder, Joe Semler. This picture looks through the living room to the office and spare bedroom. You can also see that the electrician has started installing the electrical boxes-the blue things attached to the studs.

The step wall on the north side of the kitchen with more electrical boxes and Joe in action. The kitchen counter will be L shaped behind the step wall and going toward the left of the picture on the half wall.
The next phase is for all the rough in work-electrical continues, ducting and plumbing work to be started.
No comments:
Post a Comment