Many of the doors were hung and the hardware attached. Mostly the doors not attached were the sliding doors for the closets which won't be hung until after the carpeting is in.


The above is the door to my shop. These double doors go to into the finishing room and the single door is for the closet that will house the dust collector and air compressor.


The same people that do the doors also are putting on the floor molding.


Here are a couple pics of the elevator. Now that the phone line is in place, it is fully functional, although the tile guy still has to tile the floor and the lip in front of it. The doors to the elevator aren't the same design as the other doors in the house because they have to be fire doors.


We are really getting anxious to be in the house now that it is getting so close to complete.