Once the foundation and footers were completed, the plumber installed the incoming water line and the lines for the waste. Simultaneously, the power company ran the incoming electric lines in the trench. Then the mason crew came back and began laying in the steel mesh for the slab. The excavator dug the holes for the foundation for the posts that will support the deck and the roof above the deck.

The next step is for the plumber (or the heating contractor) to attach the PEX tubing for the radiant heat to the steel mesh. Here are the latest pictures: