skip to main |
skip to sidebar
The slab was poured!
This morning the slab was poured. They had had to do some framing in of the various sections that needed special attention, for example the pit for the elevator and the ramp in the garage that drops about 4 inches to the garage floor. All garages here have a step up to protect the mechanicals. You can also see the semi-circle which is the foundation for the post that will support the second level deck.

No comments:
Post a Comment